RODA ROLAIRE INSTALLATION INSTRUCTIONS MANUAL Pdf Download (2024)

  1. Manuals
  2. Brands
  3. Roda Manuals
  4. Other
  5. ROLAIRE
  6. Installation instructions manual

Frameless door

Hide thumbs

1
2
3
4
5
6
7
8
9
10
11
12
13
14
  • Bookmarks

Advertisem*nt

Quick Links

Download this manual

INSTALLATION

INSTRUCTIONS

935 RODA

FRAMELESS DOOR

ROLAIRE

QCI0150 REV. 0

Page 1 of 14

Certified 06/04/10

NextPage
  • 1
  • 2
  • 3
  • 4
  • 5

Advertisem*nt

RODA ROLAIRE INSTALLATION INSTRUCTIONS MANUAL Pdf Download (1)

Summary of Contents for Roda ROLAIRE

  • Page 1 INSTALLATION INSTRUCTIONS 935 RODA FRAMELESS DOOR ROLAIRE QCI0150 REV. 0 Page 1 of 14 Certified 06/04/10...
  • Page 2 ROLH-935 Rolaire Parts List ITEM QTY. PART NUMBER DESCRIPTION SC893 1" HEADER, TUBE SC938 U-CHANNEL (HORIZONTAL) SC938 U-CHANNEL (VERTICAL) SC892 FILLER SCV920 3/8" VINYL, DRIP SCV353 3/8" VINYL, SEAL SC4700 WALL MOUNT HEADER BRACKET SC4640 CLAMP WITH ANTI-JUMPER SC4800-01 ROLLER ASSEMBLY WITH STOPPER PIN...
  • Page 3 QCI0150 REV. 0 Page 3 of 14 Certified 06/04/10...
  • Page 4: Installation Notes

    Tools: To install your Basco Shower Enclosure, you will need the following: - Pencil - Hack Saw - Low Tack Masking Tape - Caulking (Clear Silicone Recommended) - Tape Measure - Caulking Gun - 4 ft & 6 ft Level - Suction Cups - #2 Phillips Screwdriver - Center Punch (if drilling into tile)
  • Page 5 If a continuous unit centerline does not exist from the original measuring process, it will be necessary to create one. Lightly mark a continuous unit centerline on the threshold. Next, mark a continuous unit centerline on each wall, starting where the threshold centerline meets the wall. Use a level to ensure the wall centerline is plumb and straight.
  • Page 6 Verify that the U-channels is cut [2] to the appropriate size. This piece of U-channel will be equal to the opening width. Next drill three 3/16” diameter holes in the center of U-channel [2] (centerline groove provided for convenience), two holes approximately 2-1/2”from each end and one in the middle. Place the U-channel in its correct position with the u-channel centerline over the threshold centerline as marked in step one.
  • Page 7 Verify that the U-channel [3] is cut properly using the below formulas: U-channel Height = Unit Height - 2 3/4” U-channel Height = Panel Glass Height - 9/16“ Note: If out of level conditions exist be sure to use the longer U-channel on the appropriate side (see illustration).
  • Page 8 Disassemble two Wall Mount Header Brackets [7] by loosening the set screws. Next, put the supplied large wall plugs into the holes that were drilled in the walls in step 2. Screw the inner part of the Header Bracket [7] into the wall with the supplied socket countersunk head screw.
  • Page 9 Place 1/8” setting blocks [20] into the U-channel as shown or approximately every 18”. DO NOT place setting blocks over screw heads, but set them close to ensure that the screw heads are below the setting blocks. SETTING BLOCK U-CHANNEL HEADER Using suction cups set, the Stationary Glass Panel into the U-channels on the...
  • Page 10 Slide the Clamp [8] over the glass panel and the Header [1] with the screw on the inside of the shower. Set a distance between the exposed glass edge and the Clamp [8] equal to 1/4” then tighten the screw. HEADER WALL MOUNT HEADER BRACKET...
  • Page 11 Mount the Roller Assembly With Stopper Pin [9] to the wall side ROLLER ASSEMBLY of the Door Panel with the bolts facing to the outside of the shower. Mount the Roller Assembly [10] to the stationary panel side of the Door Stationary Panel with the bolts facing to the outside of the shower.
  • Page 12 No gap between cam shaft and rod Be sure to tighten the set screws before releasing the door. DOOR PANEL View from Inside Shower STATIONARY PANEL Note: The Rollers [9 &10] have +/-1/8” height adjustment. Reinstall the Anti-jumper on the Clamp [8] which was removed from the Clamp (see step10).
  • Page 13 Place 18” Pull/Knob [13] or Back to Back Knob [13] on the Door Panel (see pictures). BACK PLATE WASHER BUSHING BUSHING WASHER 18” PULL KNOB KNOB KNOB BACK TO BACK KNOB 18” PULL/KNOB Place the Bottom Catch [12] onto the bottom of the Door Panel approximately 1/4” from the edge of the door.
  • Page 14 On the interior face of the Side Panel, place a strip of low tack tape on the glass about 1/8” to 3/16” away from edge of the u-channel both vertically and horizontally. Run a small bead of silicone along this edge. Finally on the interior, run a bead of silicone between the u-channel and the threshold and also between the u-channel and the wall.

This manual is also suitable for:

Rolh-935

RODA ROLAIRE INSTALLATION INSTRUCTIONS MANUAL Pdf Download (2024)
Top Articles
Latest Posts
Article information

Author: Tish Haag

Last Updated:

Views: 5613

Rating: 4.7 / 5 (67 voted)

Reviews: 82% of readers found this page helpful

Author information

Name: Tish Haag

Birthday: 1999-11-18

Address: 30256 Tara Expressway, Kutchburgh, VT 92892-0078

Phone: +4215847628708

Job: Internal Consulting Engineer

Hobby: Roller skating, Roller skating, Kayaking, Flying, Graffiti, Ghost hunting, scrapbook

Introduction: My name is Tish Haag, I am a excited, delightful, curious, beautiful, agreeable, enchanting, fancy person who loves writing and wants to share my knowledge and understanding with you.